Bathroom remodelling changes the shape of the room itself. That might mean taking in a separate WC, an airing cupboard or a box room, moving a stud wall or a door, or creating an ensuite. In London it typically costs between £10,000 and £22,000, the widest range of any of our six jobs, because the structural work varies so much.
What you can expect to pay
Typical bathroom remodelling costs in London, supplied and fitted
| Job size | What it usually covers | Typical cost |
|---|---|---|
| Small | Non-structural partition or door moved, bathroom refitted in the new space | £10,000–£14,000 |
| Typical | Separate WC taken in or an ensuite formed, services extended into the new area | £14,000–£18,000 |
| Large | Structural opening with a steel, or an ensuite created from part of a bedroom | £18,000–£22,000+ |
Most of the difference between the bands is structure and services, not the suite. A change that stays within the existing walls belongs in the bathroom layout redesign cost guide.
Is the wall holding anything up?
This decides the budget more than anything else. A thin stud partition between a toilet room and a bathroom is cheap to remove. A brick wall that carries the floor above, or a wall that sits under a chimney breast or the roof, needs a structural calculation, a steel beam and usually Building Regulations approval. In a London terrace the small WC off the landing or beside the bath is often a plasterboard partition, but you cannot tell by tapping. A fitter or structural engineer should look first, and the government's guidance on Building Regulations approval explains when it is needed.
What moves the price within a tier
- Structural opening. Steel, padstones, temporary support and building control inspections are a separate cost line from the bathroom itself.
- Drainage. If the toilet moves to a new wall, the waste has to fall properly to the stack, which can mean boxing in or lifting the floor.
- Making good. Joining new walls and floors to old ones takes more plastering and carpentry than most people expect.
- Extra services. A new ensuite needs a supply, a waste, ventilation and a circuit, often through a room that was not designed for them.
- Windows and doors. Moving a doorway, or adding extraction where there was no window, adds to the list.
- Access. As on every London job, stairs, parking and working-hour limits affect the programme.
Flats are different
In a leasehold flat, moving walls usually needs your freeholder's written consent, and anything touching a shared stack or the floor over a neighbour is likely to be scrutinised. Our guide to renovating a bathroom in a leasehold London flat covers what to ask for, and why you should have permission before the work is priced.
Many remodels are quoted in two parts: the structural and building work, then the bathroom fit-out. Ask each fitter to split their quote that way, so you can see what you are paying for the new layout and what for the new bathroom.
What a fair quote should show
- Who arranges the structural calculation and building control, and who pays
- Demolition, support, the steel or lintel and making good
- Revised drainage, supplies and electrics for the new layout
- Ventilation for any room without a window
- The bathroom fit-out, itemised as in a normal renovation
- Programme, payment stages, VAT and guarantee
Compare the figures with the complete bathroom renovation cost guide to see how much of your quote comes from the structure.
Frequently asked questions
How much does it cost to remodel a bathroom in London?
Bathroom remodelling in London typically costs between £10,000 and £22,000. A simple partition move sits near the bottom, and structural openings or new ensuites sit near the top.
Do I need building regulations approval to knock a toilet into the bathroom?
If the wall is non-structural, it often needs little more than a notification for the drainage and electrics, but a load-bearing wall does need approval. Your fitter or a structural engineer should confirm before work starts.
How long does a bathroom remodel take?
Most take between 12 and 20 days on site. Structural work, building control inspections and plastering drying times lengthen the programme compared with a standard fit.
Can I remodel a bathroom in a leasehold flat?
Often, but you will usually need the freeholder's written consent first, and any change near a shared stack or a neighbour's ceiling may attract conditions. Check your lease before getting quotes.
Ready to talk to a bathroom remodelling specialist?
Get Free Quotes →
