Cost guide

Bathroom Layout Redesign Cost in London: Moving the WC, Swapping the Bath for a Shower or Shifting the Basin

Rearranging a London bathroom within its four walls typically costs £7,000–£15,000, depending on how many fittings move and where the waste runs.

⏱ 5 min readUpdated 31 October 2026Covers: Bathroom Layout Redesign
Illustration of two plan views of the same small bathroom, the first with a bath along the wall and the second with a walk-in shower in its place, and an arrow between them

A bathroom layout redesign rearranges the fittings inside the existing four walls. Typical changes include moving the toilet to another wall, replacing the bath with a walk-in shower, or repositioning the basin. In London it typically costs between £7,000 and £15,000.

What you can expect to pay

Typical bathroom layout redesign costs in London, supplied and fitted

Job sizeWhat it usually coversTypical cost
SmallOne fitting moved on the same wall, waste run kept short£7,000–£9,700
TypicalToilet moved or bath swapped for a walk-in shower, new waste route£9,700–£12,300
LargeSeveral fittings moved, raised floor or boxing-in needed for the stack£12,300–£15,000+

Why moving the toilet costs the most

Basins and baths are easy to move because their waste pipes are small. A toilet has a wide soil pipe that must fall continuously towards the stack, and the further it is from the stack, the more floor depth it needs. In a ground-floor room that can mean trenching. In an upstairs bathroom it often means boxing the pipe in, lifting the floor, or both. In a flat the position of the shared stack can decide the whole design. See our guide to bathroom problems in old London homes for the pipework issues that often come up once the floor is opened.

What moves the price within a tier

  • Distance from the stack. A short move is a small job. A long one needs more pipe, more fall and more floor work.
  • Floor construction. Timber joists can be notched within limits. A concrete floor means cutting channels or building up above it.
  • Number of fittings moved. Each one needs new supplies, a new waste and often new tiling behind it.
  • Shower in place of the bath. The drain, tray or wet-room floor and waterproofing add cost over a bath.
  • Ventilation and electrics. A new layout often means moving the light, the fan and the shaver socket.
  • Making good. Patching tiles, plaster and flooring around the old positions is part of the bill.
Draw it before you price it

A scaled drawing with the stack, joists, door swing and window marked saves arguments later. Ask each fitter whether they include a plan in the price or charge separately, and check that every quote is based on the same layout.

A layout change in a flat

Moving a toilet in a leasehold flat needs more than a fitter's say-so. Freeholders tend to want to see drawings, and neighbours below may need reassurance about noise and leaks. Read our guide to renovating a bathroom in a leasehold London flat before settling on a new layout. If you are also thinking about moving walls, the bathroom remodelling cost guide covers that.

What a fair quote should show

  • Which fittings move, from where to where, with a plan
  • New waste route and fall, and whether the floor is lifted or boxed in
  • New supplies and how they reach each fitting
  • Waterproofing for any new shower area
  • Tiling area and making good
  • Programme, payment stages, VAT and guarantee

Frequently asked questions

How much does it cost to change a bathroom layout in London?

A bathroom layout redesign in London typically costs between £7,000 and £15,000. Moving one fitting is at the lower end. Several moves or a toilet far from the stack push towards the top.

Is moving a toilet expensive?

It is usually the costliest single move, because the soil pipe needs a continuous fall and the floor may have to be lifted or the pipe boxed in. Basins and baths are easier.

Can I swap my bath for a walk-in shower?

Usually, yes. The cost depends on where the new drain sits, the floor construction and how the area is waterproofed. A fitter will need to look at the floor.

How long does a layout change take?

Most take between 7 and 12 days on site, though plumbing and floor work can lengthen it if the stack is some distance from the new positions.